 First day report in at TNB Janamanjung
 A brief introduction about the power plant by Mr. Nurul Akla
 Attend to safety induction which conducted by Mr.Wan Azhanizam. After the safety induction safety helmet and hear muff has been given.
 collected touch n go entry pass from safety manager Mr. Salleh
 Visit to plant site with Mr. Nurul Akla
 Briefing on general administrative information and ISO familiarisation
 Was introduced to boiler maintenance section senior engineer
 I was assigned at boiler maintenance section
 Went to inspect pulverized coal (PC) pipe leakage
 A repair was carried out on air compressor no. 13 at Fly Ash Compressor House. The AN of the compressor was dismantled and sent to manufacturer for repair.
 The defect was on Induced Draft (ID) fan, one of the inlet guide vane roller nearly came out of the crown. Force was used to push it back inside.
 Replaced punctured compressor hose used to connect portable compressor and outlet of air compressor no. 14 at fly ash compressor house.