First day report in at TNB Janamanjung
A brief introduction about the power plant by Mr. Nurul Akla
Attend to safety induction which conducted by Mr.Wan Azhanizam. After the safety induction safety helmet and hear muff has been given.
collected touch n go entry pass from safety manager Mr. Salleh
Visit to plant site with Mr. Nurul Akla
Briefing on general administrative information and ISO familiarisation
Was introduced to boiler maintenance section senior engineer
I was assigned at boiler maintenance section
Went to inspect pulverized coal (PC) pipe leakage
A repair was carried out on air compressor no. 13 at Fly Ash Compressor House. The AN of the compressor was dismantled and sent to manufacturer for repair.
The defect was on Induced Draft (ID) fan, one of the inlet guide vane roller nearly came out of the crown. Force was used to push it back inside.
Replaced punctured compressor hose used to connect portable compressor and outlet of air compressor no. 14 at fly ash compressor house.