The defect was at unit 1 boiler circulation pump (BCP), non-return valve. There was a leak at the valve. Therefore, the gland packing was changed.
Changed gland packing at superheated steam drain pot level switch isolation valve.
Changed gland packing at atomizing steam control valve.
Cleaned all 16 LFO burner gun nozzle head at unit 1 boiler.
Lapping process was done on the boiler drum gauge glass due to steam leaking.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment