Thursday, July 1, 2010

week no.6

 Collected sample oil from ID fan, FD fan, FGD fan, and PA fan. The sample oil was collected from drain valve at each of the fan. These sample oil will be sent to R&E section and they will test the oil viscosity.

 Online sealing repair at unit 1 steam pipe. The work was done by In-Situ contractors, where clamp were used to seal the leakage.

 A soot blower lance tube was stuck in the furnace while the motor and blower carriage retracted back to its original position. It was due to broken bolt, which was connecting lance tube and blower carriage. The lance tube was then pulled out using chain block.

 Top up oil at air heater guide bearing.

 Went to inspect air heater soot blower. It was suspected not functioning well.

 Tightened packing nut at all unit 3 soot blower. Besides that, lubrication spray was sprayed at the soot blower chain.