Thursday, July 1, 2010

week no.7

 Replaced Light Fuel Oil (LFO) pump bearing. After assemblingthe new bearing, the two coupling halves were precisely aligned.

 Attended program Sisih Perdana 2, which was held at TNBJ 1 building.

 Disassembled soot blower gearbox at unit 1 long retractable soot blower. Before disassembled soot blower gearbox, the steam pipe to the soot blower was blanked. The gearbox was then brought back to workshop for servicing.

 Serviced auto drain valve at unit 2 Electrostatic Precipitator (ESP) buffer tank.

 Top up compressor oil at instrument air house.