Replaced Light Fuel Oil (LFO) pump bearing. After assemblingthe new bearing, the two coupling halves were precisely aligned.
Attended program Sisih Perdana 2, which was held at TNBJ 1 building.
Disassembled soot blower gearbox at unit 1 long retractable soot blower. Before disassembled soot blower gearbox, the steam pipe to the soot blower was blanked. The gearbox was then brought back to workshop for servicing.
Serviced auto drain valve at unit 2 Electrostatic Precipitator (ESP) buffer tank.
Top up compressor oil at instrument air house.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment